Engtips.

Mechanical engineering general discussion. (88334 members) forum404 - Professional forum and technical support for engineers for Mechanical engineering general discussion. Includes problem solving collaboration tools.

Engtips. Things To Know About Engtips.

Metal and Metallurgy engineering. (45224 members) forum330 - Professional forum and technical support for engineers for Metal and Metallurgy engineering. Includes problem solving collaboration tools. Forum. Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for DASSAULT: SOLIDWORKS 3D Design. Includes problem solving collaboration tools. Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for DASSAULT: ABAQUS FEA Solver. Includes problem solving collaboration tools. Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng …Normally gauges and transmitters come in 1/2 " size. I've not seen many 1/2" flanges used. My standard is to have a flanged isolation valve ,1" often with a 2" tee off the main line and a reducer for mechanical integrity, with a tapped blank flange.

Note that if you select either pinned or fixed, you are departing from reality already, as the connection is unlikely to fit either exactly. So it could be modeled as intermediate in various ways as well. If you neglect deflections in the roof unrelated to this load, you are departing from reality.MotorCity (Structural) 16 Sep 04 09:48. KarlIt, I would suggest consulting the goal manufacturer to obtain the design loads. The support system will vary among models and manufacturers. This type of loading is not governed by any particular code as it is not a building or structure. That has been my approach for the gymnasium designs in the ...

U.S. stocks traded higher this morning, with the Dow Jones gaining more than 100 points on Friday. The Dow traded up 0.41% to 33,473.16 while the... U.S. stocks traded higher this...1) Perforated. There are code restrictions on why you can use this. It is generally less expensive than the FTAO (Force Transfer Around Openings) method because it does not require you to use straps around all the openings. 2) FTAO: To me, this method is merely a "rational" method.

The new search is useless, but hopefully the features of the legacy search will be reinstated soon. CWB1 (Mechanical) 28 Jan 24 16:22. I usually have better luck applying search codes like "site:eng-tips.com" in a commercial search engine like google, duckduckgo, etc rather than version of those same engines that are on the websites … Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for DASSAULT: SOLIDWORKS 3D Design. Includes problem solving collaboration tools. Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for ASME (mechanical) Code Issues. Includes problem solving collaboration tools.Specifically, bollards for protection are angled toward the direction of the expected threat; this provides an added measure of strength, since there's no reason to make the bollards be symmetrical in protection direction/angle. Angling the bollard could reduce the required thickness of the bollard, since the collision energy is directed ...

Rules of Thumb - Structural Engineering Other Technical Topics FAQ - Eng-Tips - Free download as PDF File (.pdf), Text File (.txt) or read online for free. For a "rule of thumb" …

Joints spacing: • Rule of thumb is 24 to 36 times the thickness (gives the spacing in mm/inches). • Keep the thickness variation to -5mm (-1/4") / +10mm (3/8"), and the subgrade as flat as possible with no abrupt change greater than 15mm (1/2") in about 1.2m (4'). This keeps the "sudden" restraint potential down.Fluid Power engineering. (8474 members) forum1083 - This group is to allow those who use hydraulics and/or pneumatics to exchange ideas and information that will assist in their proper use and that the discussions will illustrate the need for and promote interest in gaining appropriate certification. Forum. Search.Petroleum engineering general discussion. (13755 members) forum481 - Professional forum and technical support for engineers for Petroleum engineering general discussion. Includes problem solving collaboration tools.GEE8B (Structural) 29 Apr 23 08:33. Dead load is always downward (direction of gravity). Wind load can be upward or downward (suction/pressure). Wind forces away from the surface are (-). Wind forces towards the surface are (+). So the “W” in 0.6D+W can be negative or positive. Pressure and suction values are typically per ASCE7, and it is ...I have modelled a pond with an outlet control structure consisting of a low flow orifice (Flowing to Device 1) and sharp crested weir (Also flowing to Device 1) discharging to a culvert (Modelled as the Primary). The report states that the weir and the orifice are controlling the flows and the culvert passes XXX of XXX … Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for ASME (mechanical) Code Issues. Includes problem solving collaboration tools. Design of Footing with very large moment. Good day! I believe this one is just simple, what makes it complex is the large moment to be considered in the design. I have an anchored steel pole with base reactions M=220kN-m, P=28kN, V=14kN,. (M=moment, P=Axial, V=Shear). I have already design the pedestal to …

Strength (whether for LRFD or ASD) for wind load is checked at a 700 year MRI for RC2 structures while service load is generally taken to be a 10 year MRI. That can be about 58% less load than the strength check. Service loads are somewhat discretionary...IBC has basic deflection calculation requirements, but they are not the end …Happy Friday. Looking at replacing the entire bottom of a 60' diameter tank. Given the foundation configuration and some other challenges, the recommended solution is to install a second bottom over the existing bottom as specified in API 653 9.10.2. Looking for a couple bench marks from members. - Confirmation there isn't an API-653 standard ...Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search …Update: My final solution was to drill and epoxy #3 bars at 24" OC (every 3 CMU courses) with 18" of embedment into the existing walls. However, there was an ice storm in late December that revealed more structural problems with the building only to be exacerbated by the winter storm from February.Nigeria’s broadcast regulator, the National Broadcasting Commission, has ordered all broadcasting stations in the country to suspend their use of Twitter. The directive was issued ...I attached a drawing just in case I can't explain myself clear enough. Anyway, I read that 'A relief valve is only needed if no other measures are provided to detect low flow conditions and shut down the centrifugal pump to prevent damage', well in my situation, there isn't a flow measuring instrument installed upstream of …

Mar 22, 2023 · From reading XR250s posts I think this is how he approaches it as well. 3. YoungGunner (Structural) 23 Mar 23 15:22. Having worked in residential for 7 years now, I have a few thoughts on the matter: First off, the IRC already shows questionable engineering compared to our "big boy" design standards/codes. ISZ, Thanks for the reply. I contacted the manufacturer and they recommended pointing the arrow toward the sky. The most apparent difference with the orientaion is the voltage output when the cell is loaded. If the arrow is down, the voltage is negative, if pointed up, the voltage is positive.

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting Guidelines. Promoting, selling, recruiting, coursework and thesis posting is forbidden. Students Click Here. Eng-Tips Posting Policies Contact US. Home > Forum Areas Aeronautics & Space Engineers Area. Only the top forums under each …Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search …The caustic scrubber is used to absorb the sour gases like H2S and CO2. To design this, you need to consider the system as an absorption column. For that you need to calculate how many equilibrium stages you have. Do not forget you have , at least, one chemical reaction (H2S + 2NaOH --> Na2S + 2H2O) if your stream doesn't have CO2.Pre-calculatoin of torispherical heads acc. to ASME BPVC VIII Div.2 2023 (4.3.6.1) leads to a thinner wall than a simple cylindrical shell (4.3.3.1). Also, theMay 1, 2017 · Fluid Power engineering. (8465 members) forum1083 - This group is to allow those who use hydraulics and/or pneumatics to exchange ideas and information that will assist in their proper use and that the discussions will illustrate the need for and promote interest in gaining appropriate certification. Forum. Search. I have modelled a pond with an outlet control structure consisting of a low flow orifice (Flowing to Device 1) and sharp crested weir (Also flowing to Device 1) discharging to a culvert (Modelled as the Primary). The report states that the weir and the orifice are controlling the flows and the culvert passes XXX of XXX …

Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search Of All Posts, And More... Register now while it ...

7 Feb 16 11:02. I am designing a isolated footing in SAFE but I am confused that how to check the footing against uplift? Soil pressure are coming as mentioned below. Against dead load Max = -9.08 KN/m^2 and Min = -18 KN/m^2. Against wind load is Max = 53.83 KN/^m2 and Min = -38.74 Kn/m^2. footing is safe against uplift????

Hi all, I'm designing a diesel tank 14m Diameter, 15m high tank with a fixed roof (rafters and roof plate). Max inlet flow rate = 870 m^3/h DN250 Max outlet floStart with the loaded front wheel loads. The 8000 pounds is presumably the lift capacity and not the total loaded weight. Looking at the contact patch on the loaded front tires will give you a sense of the local punching and beam shear demand-to-capacity ratios.Bell 407 Boeing VR-7 Narramore 8%. Bell 409 YAH-63 Wortmann FX 69-H-083 Wortmann FX 69-H-083. Bell 412 Boeing VR-7 Wortmann FX 69-H-080. Bell 427 Boeing VR-7 Narramore 8%. Bell 47G-2 H-13G wood blades NACA 0017 NACA 0011. Bell 47G-2 H-13H metal blades NACA 0015 NACA 0015. Bell 47J HUL wood blades NACA …The first one is applying point load on the flange and the Beff that can be used for capacity calculation. Mu = P x a. S = beff x t^2 / 6. Mc = phi x fy x S. Second image is the scenario with stiffener added. How do we calculate the capacity for such cases? Thanks.I want to summarize as follows: Rule 1) The direction of the coordinate axis should align with the direction from "Grid A to Grid B" of the bush element. Rule 2) The "positive" direction of your coordinate system …Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search Of All Posts, And More... Register … Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search Of All Posts, And More... Register now while it ... Shear walls3. I was reading reinforced concrete mechanics by MacGregor about shear walls. The book says that a possible solution to decrease foundation size is to " Attach the base of the wall to the ground-floor diaphragm and basement floor to provide a horizontal force couple to react to the moment at the …

March 12, 2024. Are you helping your patients with type 1 diabetes make the most of continuous glucose monitoring (CGM) devices? At the Advanced Technologies & …You mean we can directly draw a cantilever beam with one end attached to a beam or column while the other end attached to nothing? The beam end is default to be fixed or pinned? slickdeals (Structural) 4 Nov 08 08:11. In ETABS, things are fixed by default unless specified explicitly to be pinned.John Werner. 2023, the writer argues, was the year in which we learned in a theoretical way about how large language models work. 2024, by contrast, is going to be …Instagram:https://instagram. garlond gl iit ignition keybakery safewaygarden.of.marie onlyfans leakedmean girls 2024 showtimes near movie tavern brannon crossing GENEVA (11 March 2024) — Syria is experiencing a wave of violence not seen since 2020, the UN Syria Commission of Inquiry warned in a report released today. … compare iphones 13 and 14cargurus corpus christi tx Wind load on the superstructure may be calculated as. 150 psf x A x L. Where 150 psf is the wind pressure (Check also your state or local requirements for different criteria), A is the area of the superstructure in elevation (Curb height, slab height, haunch height, girder and any superelevation), and L is the tributary length … pacer docket search A common rule for situations like this is extend the depth of calculation to the point where the added pressure is 10% of existing pressure. the total extent of settlement is informed by soil modulus and the consolidation index (Cc) or consolidation ratio (Cec). If the clay is overconsolidated, then it'd be Cr, or Cer.JAE (Structural) 9 Feb 11 21:01. Sounds like you got it. wannabeSE (Civil/Environmental) 9 Feb 11 21:13. If you are anchoring the equipment to masonry or concrete, look at ASCE 7-05 section 13.4.2. You may need to multiply the seismic force by 1.3. Also, if the anchors are not prequalified for seismic, you may need to … Safety Relief Valve engineering (PSV) (8427 members) forum1203 - Professional forum and technical support for engineers for Safety Relief Valve engineering (PSV). Includes problem solving collaboration tools. Forum.